1 CA-CV 18-0306 Precedential Affirmed Processed

Gordon v. Arc

Arizona Court of Appeals · Filed July 23, 2019 · 447 P.3d 327

Opinion text

IN THE
ARIZONA COURT OF APPEALS
DIVISION ONE

MARK R. GORDON, Plaintiff/Appellant,

v.

ARIZONA REGISTRAR OF CONTRACTORS, et al., Defendants/Appellees.

No. 1 CA-CV 18-0306
FILED: 7-23-2019

Appeal from the Superior Court in Maricopa County
No. LC 2015-000451-001
The Honorable Patricia A. Starr, Judge

AFFIRMED

APPEARANCES

Mark R. Gordon, Phoenix
Plaintiff/Appellant

Arizona Attorney General’s Office, Phoenix
By Thomas C. Raine
Counsel for Defendants/Appellees
GORDON v. ARC, et al.
Opinion of the Court

OPINION

Judge Jennifer B. Campbell delivered the opinion of the Court, in which
Presiding Judge Paul J. McMurdie and Judge Samuel A. Thumma joined.

C A M P B E L L, Judge:

¶1 The Residential Contractors’ Recovery Fund (the “Fund”)
was established to provide a remedy to homeowners injured by unethical
or negligent contractors. Mark Gordon seeks an award from the Fund based
on the cost of home repairs arranged under his home warranty policy.
Because breach of a home warranty contract is not a claim arising from a
violation of the regulations governing contractors, he is not entitled to
collect from the Fund. We affirm.

BACKGROUND

¶2 In 2008, Gordon purchased a home warranty policy from
InHouse Home Warranty, Inc. InHouse held two licenses: a license to sell
home warranty policies, issued by the Department of Insurance (“DOI”),
and a license for air system repair and replacement, issued by the Registrar
of Contractors (“ROC”). The policy promised coverage through 2012.
Although InHouse’s DOI license expired in 2009, Gordon continued to pay
premiums through mid-2011.

¶3 The policy covered repairs on a wide range of household
systems. Gordon paid an annual premium plus a $45 fee for each service
call. After receiving service calls, InHouse often arranged with independent
contractors to complete the actual work. An exception to this practice was
for air system repair, which InHouse performed under its ROC license. In
October 2011, InHouse stopped answering Gordon’s calls for service.
Gordon filed a complaint with the ROC, accusing InHouse of performing
work outside the scope of its ROC-issued license, aiding and abetting an
unlicensed contractor, operating as an insurance company without a
license, and failing to respond to new requests for service.

¶4 InHouse did not answer Gordon’s complaint. The ROC
deemed all of Gordon’s allegations admitted and issued a default decision
and order revoking InHouse’s air system license—the only license InHouse
held subject to the ROC’s jurisdiction. Next, Gordon sought an award from

2
GORDON v. ARC, et al.
Opinion of the Court

the Fund. See Ariz. Rev. Stat. (“A.R.S.”) § 32-1132, amended by A.R.S. § 32-
1132 (2019).1 The ROC denied Gordon’s claim, concluding that he was not
eligible because the InHouse home warranty policy was not a construction
contract. The ROC also concluded that damages claimed by Gordon did not
result from incomplete or defective workmanship—the only damages that
can be paid out of the Fund.

¶5 Gordon requested a hearing with an administrative law judge
(“ALJ”) to determine whether the policy was a construction contract under
A.R.S. §§ 32-1101 and -1132. At that hearing, Gordon argued that payments
he made for each service call under the policy provided the consideration
necessary to create distinct construction contracts with InHouse.

¶6 The ALJ concluded that “InHouse’s main contract with
Mr. Gordon was a home warranty policy to cover the risk that home repairs
might be necessary in the future . . . [and] not a construction contract to
perform specific repairs for a definite and fully liquidated consideration.”
The ALJ noted that “[t]he only possible exception” was work InHouse
performed on the home’s air system. The ROC accepted the ALJ’s
conclusion, adopting it as the final administrative decision.

¶7 Gordon appealed to the superior court and the superior court
affirmed the ALJ’s decision. The superior court explained that the policy
was a home warranty agreement regulated by the DOI and not the ROC.
The court also concluded that Gordon’s complaints relating to the air
system “stemmed from his belief that it should have been covered by the
home warranty, and not from any workmanship issues.” The court also
rejected Gordon’s assertion that his due process rights had been violated.
Gordon appeals this decision.

DISCUSSION

¶8 We will affirm an agency’s decision unless it “is contrary to
law, is not supported by substantial evidence, is arbitrary and capricious or
is an abuse of discretion.” A.R.S. § 12-910(E); Ritland v. Ariz. State Bd. of Med.
Exam’rs, 213 Ariz. 187, 189, ¶ 7 (App. 2006). We review the interpretation of
statutes de novo, turning first to the language of the statute, Pinnamaneni v.

1 During the pendency of this appeal, the Arizona Legislature amended
statutes relevant to this case in Title 32. See 2019 Ariz. Sess. Laws 145 (1st
Reg. Sess.). We apply the law in effect when Gordon’s claim began, unless
otherwise noted. While we do not interpret the amended statutes, we
provide parallel citations to the 2019 Arizona Revised Statutes for reference.

3
GORDON v. ARC, et al.
Opinion of the Court

Ariz. Registrar of Contractors, 237 Ariz. 147, 149, ¶ 10 (App. 2015),
“effectuat[ing] the text if it is clear and unambiguous,” BSI Holdings, LLC v.
Ariz. Dep’t of Transp., 244 Ariz. 17, 19, ¶ 9 (2018). We read words in context
and look to the statute as a whole to interpret a specific provision.
Stambaugh v. Killian, 242 Ariz. 508, 509, ¶ 7 (2017). If the statute is
ambiguous, we may consider “the statute’s history, context, consequences,
and purpose.” Wilks v. Manobianco, 237 Ariz. 443, 446, ¶ 8 (2015).

¶9 We affirm the superior court for three independent reasons:
(1) Gordon did not have a construction contract with InHouse to perform
all the warranty repairs; (2) Gordon is not a “person injured” under the
relevant statute; and (3) Gordon did not suffer any actual damages.

I. Gordon’s home warranty policy was not a construction contract
subject to regulation by the ROC.

¶10 Gordon cannot collect from the Fund because the damages he
claimed arose from an alleged breach of his home warranty policy, not from
defective or incomplete work by a contractor. The statutory definition of a
“home warranty policy,” subject to regulation by the DOI, plainly describes
the insurance policy here: “a contract or agreement sold for a separately
stated consideration for any duration that provides for [or indemnifies] . . .
[t]he service, maintenance or repair, including replacement, of all or any
part of structural components, appliances, electrical, plumbing, heating,
cooling or air conditioning systems of residential property.” A.R.S. §§ 20-
1095(3), (7)(b)(i); -1095.10(A). Violations of a home warranty policy are
squarely within the purview of the DOI—not the ROC. The DOI, therefore,
has the exclusive authority to discipline home warranty insurers and to
provide consumer protections. See A.R.S. § 20-1095.09.

¶11 We are not persuaded by Gordon’s argument that payment of
the service fee created separate construction contracts within the meaning
of Title 32. A construction contract is defined as “a written or oral
agreement relating to the construction, alteration, repair, maintenance,
moving or demolition of any building, structure or improvement or relating
to the contractor’s excavation of or other development or improvement to
land.” A.R.S. § 32-1154(B)(1), amended by A.R.S. § 32-1154(B)(2)(a) (2019). In
short, the service fee Gordon paid when he called for a repair did not create
a contract with InHouse for performance of that service; it charged under
his insurance policy, much like a co-pay for a doctor’s office visit. The main
contract Gordon had with InHouse was the home warranty policy—not a
contract for construction. Gordon did not raise claims against any of the
contractors who actually performed work on his property.

4
GORDON v. ARC, et al.
Opinion of the Court

¶12 Gordon argues that the ROC admitted there were
construction contracts at issue in his dealings with InHouse. In support, he
alleges that the ROC withheld internal file “Notes” comparing his home
warranty to a construction contract. At the administrative hearing, the ALJ
explained that any such documents were irrelevant. We agree with the ALJ.
The issue presented to the ALJ was a question of statutory interpretation,
and thus the ALJ was not bound by the agency’s legal opinion, even if the
“Notes” existed.

II. Gordon has not shown that he is entitled to recovery from the Fund
as a “person injured” by a residential contractor.

¶13 The second independent reason barring Gordon from
collecting from the Fund is that he does not qualify as a
“person injured.” A.R.S. § 32-1131(3)(a), amended by A.R.S. §§ 32-
1131, -1132(B) (2019). The Fund is available only to a “person injured,”
A.R.S. § 32-1132(A), amended by A.R.S. § 32-1132(B) (2019), defined as one
who is “damaged by the failure of a residential contractor or a dual licensed
contractor to adequately build or improve a residential structure or
appurtenance on that real property.” A.R.S. § 32-1131(3)(a), amended by
A.R.S. § 32-1131 (2019). Gordon did not allege damage from workmanship
deficiencies for any incomplete work.

¶14 InHouse did complete the installation of a new air system
under its ROC license. While Gordon alleges that work related to the air
system should have been covered under his warranty and challenges the
amount of labor billed, he does not complain that the system InHouse
installed fails to work as intended—only that the labor was unnecessary
and the cost was too high. This allegation does not fall within the statutory
definition of a “person injured,” precluding recovery from the Fund.2

2 Gordon argues that the ROC failed to meet its statutory obligation to
“investigate the acts of any contractor” upon written complaint of a
homeowner, A.R.S. § 32-1154(B), amended by A.R.S. § 32-1154(B)(2) (2019),
by failing to promptly perform an on-site inspection of his home. The
statute only requires an investigation when a person “suffers a material loss
or injury as a result of a contractor’s failure to perform work in a
professional and workmanlike manner.” Id.

5
GORDON v. ARC, et al.
Opinion of the Court

III. Gordon failed to allege any “actual damages” that would qualify
him for compensation from the Fund.

¶15 The third independent reason supporting the denial of
Gordon’s claim is his failure to allege actual damages. The Fund was
created to compensate homeowners for actual damages suffered as a direct
result of the contractor’s failure to adequately build or improve a residential
structure or appurtenance. A.R.S. § 32-1132(A), amended by A.R.S. §§ 32-
1132(B)(1), -1132.01(A) (2019). The proper measure of damages is the cost of
completing the contract and repairing a contractor’s defective performance,
less the part of the contract price still unpaid. Ramsey v. Ariz. Registrar of
Contractors, 241 Ariz. 102, 106-07, ¶ 11 (App. 2016). Because Gordon did not
claim that any contractor’s work was performed defectively or that any of
the work performed by a contractor was incomplete, he did not suffer
damage compensable by the Fund.

¶16 Gordon sought reimbursement of money he paid InHouse to
replace his broken air system. Gordon alleged that InHouse initially
responded to a service call for which Gordon paid $45. InHouse notified
him that the air system would need to be replaced and that associated labor
costs were not covered under his policy. After InHouse completed the
work, Gordon only complained about the price and time the project took to
complete, but did not allege that the air system failed to function after
service was complete. Gordon failed to allege any “actual damage” that
would be compensable through the Fund.

IV. Gordon’s right to due process was not violated.

¶17 Gordon argues that his due process rights were violated
because he had no notice that his Fund claim would be barred absent an
allegation of defective workmanship. The requirements for filing a ROC
complaint are outlined in A.R.S. § 32-1155, amended by A.R.S. § 32-1155
(2019). Moreover, a description of “actual damages” appears on Gordon’s
Fund application. Gordon bore the responsibility to investigate and
properly identify the deficiency and the relief requested.

¶18 Next, Gordon cites Pinnamaneni, 237 Ariz. at 148, ¶ 1, arguing
that his ROC complaint need not allege a workmanship deficiency to
establish eligibility under the Fund. Gordon misconstrues the holding of
Pinnamaneni, which did not address the issues raised here and lends no
support to his argument. Id.

¶19 “Procedural due process means that a party had the
opportunity to be heard ‘at a meaningful time and in a meaningful

6
GORDON v. ARC, et al.
Opinion of the Court

manner.’” Comeau v. Ariz. Bd. of Dental Exam’rs, 196 Ariz. 102, 106-07, ¶ 20
(App. 1999) (quoting Mathews v. Eldridge, 424 U.S. 319, 333 (1976)). Gordon
had ample opportunity to present his case through his ROC complaint,
Fund application, and hearing with an ALJ where he presented evidence,
testified, and cross-examined witnesses. Gordon was afforded procedural
due process and he has shown no error in the way the proceedings were
conducted.

CONCLUSION

¶20 For the foregoing reasons, we affirm. We deny Gordon’s
request for costs.

AMY M. WOOD • Clerk of the Court
FILED: RB

7